After received the 2nd revise plan, it fixed the driveway gradient issue by move 2m to the back,
but there is a new issue " Telstra Pit" on driveway, which make the driveway became single lane.
I have contacted Telstra and then they arrange some one to fix it by put steel cover on top,
so we will be able to drive over it.
Overview of the current construction as of 2nd Oct 2013